Close Menu
Warsaw.Today
    What's Hot

    Will Bolt choose Europe or the US for its IPO?

    November 24, 2026

    Reports: Russia may launch nuclear weapon into orbit as soon as next month

    November 24, 2026

    Scandinavian Airlines: Los Angeles – Copenhagen, Denmark. $548 (Basic Economy) / $648 (Regular Economy). Roundtrip, including all Taxes

    November 24, 2026
    Facebook X (Twitter) Instagram
    Trending
    • Will Bolt choose Europe or the US for its IPO?
    • Reports: Russia may launch nuclear weapon into orbit as soon as next month
    • Scandinavian Airlines: Los Angeles – Copenhagen, Denmark. $548 (Basic Economy) / $648 (Regular Economy). Roundtrip, including all Taxes
    • South Korean education minister quits over AI cheating measures
    • Megaspeed, the company at the center of the Jensen Huang scandal, appears headed for a US blacklist
    • Scandinavian Airlines: Seattle – Copenhagen, Denmark. $448 (Basic Economy) / $548 (Regular Economy). Roundtrip, including all Taxes
    • US adds Megaspeed, firm at centre of Nvidia scandal, to export control list
    • Greece renews calls for Parthenon Marbles return
    Facebook X (Twitter) Instagram
    Warsaw.TodayWarsaw.Today
    Demo
    • Home
    • News
    • World
    • Sports
    • Business
    • Culture
    • Politics
    • Travel
    • Technology
    Warsaw.Today
    Home»News»Spain requires data centres to draw 80% of their electricity from renewables
    News

    Spain requires data centres to draw 80% of their electricity from renewables

    Peter NovakBy Peter NovakNovember 20, 2026No Comments1 Views
    Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Tumblr Email
    Spain requires data centres to draw 80% of their electricity from renewables
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Spain tightens regulation of data centres with new requirements on renewable energy, efficiency and digital sovereignty to limit their impact on the power grid and attract sustainable investment.

    The Spanish government has approved new rules for data centres that set renewable energy consumption requirements, water and energy efficiency standards and digital sovereignty obligations, with the aim of aligning the growth of these infrastructures with the capacity of the electricity system and the country’s environmental commitments.

    The Royal Decree, approved on Friday by the Council of Ministers, requires data centres to prove that 80% of their electricity consumption comes from renewable sources, with hourly matching between generation and consumption and additionality criteria to drive new clean production capacity.

    The regulation provides for long-term power supply contracts, self-consumption and energy storage. It also establishes a voluntary transitional regime for operators that agree to the possibility of being disconnected with priority when this is necessary to safeguard the stability of the electricity grid.

    Stricter energy and environmental requirements

    The rules introduce provisional limits on water and electricity use in data centres: they will have to use water more efficiently and cut the energy needed for their operation, while European criteria are finalised. The text also incorporates into national law other transparency and water and energy efficiency requirements laid down by European regulation, adapting them to Spain’s specific circumstances.

    The regulation introduces sustainability reporting obligations for the largest facilities and sets specific data protection and digital sovereignty requirements for high-category information systems under the National Security Framework.

    In these cases, the most sensitive data must remain within the European Economic Area and controls will be tightened on access from third countries to administration, maintenance and support tasks.

    Failure to comply with certain obligations may lead to financial compensation and sanctions, including suspension of grid access and connection rights for up to three years. Projects that are already being processed will generally have six months to adapt to the new conditions.

    35 GW between permitted capacity and projects in the queue

    The decision comes at a time of strong growth in demand for digital infrastructure in Spain. Third Vice-President and Minister for Ecological Transition, Sara Aagesen, said that data centres currently have 15 gigawatts (GW) of granted access capacity to the electricity grid, while a further 20 GW remain on the waiting list.

    The minister warned that, without control measures, the expansion of these facilities could generate an additional cost of up to 5,000 million euros per year in the electricity system, according to government estimates: 4,000 million from the impact on wholesale prices and another 1,000 million from capacity mechanisms.

    “In the absence of this Royal Decree, we would see an impact of 5,000 million euros on our bills,” said Energy Transition Minister Sara Aagesen. “We have different scenarios, but it would lead, for example, to industrial consumers having to pay 25% more for the electricity they use,” she added. These figures are government forecasts for a hypothetical scenario, not costs already incurred or savings guaranteed by the new rules.

    17,142 million euros of investment in the electricity grid

    At the same time, the government has approved new electricity grid planning up to 2030, providing for investments of 17.142 million euros to expand and reinforce infrastructure and meet rising demand. The plan includes capacity for new forms of consumption, including data centres, although it is not specifically dedicated to these facilities.

    Spain is seeking to consolidate its position as a destination for international investment in data centres, drawing on its renewable resources, connectivity and strategic location in Europe.

    The new regulation is designed to tie that growth to greater energy and environmental efficiency, in a context where the availability of electricity, water and connection capacity has become one of the key factors in the development of these projects. The impact on ongoing projects and future investment will depend on how the new obligations are applied and on the deadlines set out in the final text.

    Source: www.euronews.com

    centres data draw requires Spain
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
    Peter Novak
    • Website

    Related Posts

    Will Bolt choose Europe or the US for its IPO?

    November 24, 2026

    South Korean education minister quits over AI cheating measures

    November 24, 2026

    Greece renews calls for Parthenon Marbles return

    November 24, 2026
    Leave A Reply Cancel Reply

    WARSAW WEATHER
    Economy News
    News

    Will Bolt choose Europe or the US for its IPO?

    By Peter NovakNovember 24, 20260

    At just 27 years old, Markus Villig became Europe’s youngest self-made billionaire, thanks to Bolt, the mobility company he founded at the age of 19 in Estonia.

    Reports: Russia may launch nuclear weapon into orbit as soon as next month

    November 24, 2026

    Scandinavian Airlines: Los Angeles – Copenhagen, Denmark. $548 (Basic Economy) / $648 (Regular Economy). Roundtrip, including all Taxes

    November 24, 2026
    Top Trending
    Technology

    Things are finally looking up for NASA’s first missions to Venus in a generation

    By Peter NovakOctober 14, 20260

    Most planetary scientists will tell you the heyday of Venus exploration was more than a generation ago. That is about to change.

    News

    Over 6,800 detained as French school protests show no sign of ending

    By Peter NovakOctober 14, 20261

    Day after day, secondary school students continue to mobilise across France. Most of the actions take the form of peaceful blockades, yet they do not erase the memory of several violent incidents.

    Travel

    American: Phoenix – Madrid, Spain. $716 (Basic Economy) / $956 (Regular Economy). Roundtrip, including all Taxes

    By Peter NovakOctober 14, 20260

    American / British Airways / Finnair / Iberia’s $956 fare is a regular economy fare with ONE checked bag and a normal size carry-on

    Subscribe to News

    Subscribe to receive the latest breaking news, local updates, and top stories from Warsaw delivered to your inbox.

    Warsaw.Today is your trusted source for breaking news, local updates, business, politics, technology, sports, culture, and events from Warsaw, Poland—all in one place.

    Facebook X (Twitter) Instagram Pinterest YouTube

    Will Bolt choose Europe or the US for its IPO?

    November 24, 2026

    Reports: Russia may launch nuclear weapon into orbit as soon as next month

    November 24, 2026

    Scandinavian Airlines: Los Angeles – Copenhagen, Denmark. $548 (Basic Economy) / $648 (Regular Economy). Roundtrip, including all Taxes

    November 24, 2026

    Subscribe to Updates

    Subscribe to receive the latest breaking news, local updates, and top stories from Warsaw delivered to your inbox.

    © 2026 ThemeSphere. Designed by ThemeSphere.
    • About Us
    • Get In Touch
    • Disclaimer
    • Privacy Policy
    • Terms and Conditions

    Type above and press Enter to search. Press Esc to cancel.