Close Menu
Warsaw.Today
    What's Hot

    Scandinavian Airlines: Los Angeles – Paris, France. $597 (Basic Economy) / $697 (Regular Economy). Roundtrip, including all Taxes

    November 25, 2026

    Meta brings its Muse AI assistant directly into Instagram DMs

    November 25, 2026

    How Trump and Silicon Valley got Nvidia to bring back Jensen Huang

    November 25, 2026
    Facebook X (Twitter) Instagram
    Trending
    • Scandinavian Airlines: Los Angeles – Paris, France. $597 (Basic Economy) / $697 (Regular Economy). Roundtrip, including all Taxes
    • Meta brings its Muse AI assistant directly into Instagram DMs
    • How Trump and Silicon Valley got Nvidia to bring back Jensen Huang
    • Qatar Airways: Philadelphia – Ho Chi Minh City, Vietnam. $981. Roundtrip, including all Taxes
    • Homo erectus lived in the rainforest alongside Denisovans
    • Qatar says it ‘will not accept’ attacks amid diplomatic row with Iran
    • JetBlue TrueBlue program: Earn and redeem points, transfer partners and more
    • NASA may get $2 billion boost as White House seeks to accelerate Artemis
    Facebook X (Twitter) Instagram
    Warsaw.TodayWarsaw.Today
    Demo
    • Home
    • News
    • World
    • Sports
    • Business
    • Culture
    • Politics
    • Travel
    • Technology
    Warsaw.Today
    Home»News»Spain requires data centres to draw 80% of their electricity from renewables
    News

    Spain requires data centres to draw 80% of their electricity from renewables

    Peter NovakBy Peter NovakNovember 20, 2026No Comments1 Views
    Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Tumblr Email
    Spain requires data centres to draw 80% of their electricity from renewables
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Spain tightens regulation of data centres with new requirements on renewable energy, efficiency and digital sovereignty to limit their impact on the power grid and attract sustainable investment.

    The Spanish government has approved new rules for data centres that set renewable energy consumption requirements, water and energy efficiency standards and digital sovereignty obligations, with the aim of aligning the growth of these infrastructures with the capacity of the electricity system and the country’s environmental commitments.

    The Royal Decree, approved on Friday by the Council of Ministers, requires data centres to prove that 80% of their electricity consumption comes from renewable sources, with hourly matching between generation and consumption and additionality criteria to drive new clean production capacity.

    The regulation provides for long-term power supply contracts, self-consumption and energy storage. It also establishes a voluntary transitional regime for operators that agree to the possibility of being disconnected with priority when this is necessary to safeguard the stability of the electricity grid.

    Stricter energy and environmental requirements

    The rules introduce provisional limits on water and electricity use in data centres: they will have to use water more efficiently and cut the energy needed for their operation, while European criteria are finalised. The text also incorporates into national law other transparency and water and energy efficiency requirements laid down by European regulation, adapting them to Spain’s specific circumstances.

    The regulation introduces sustainability reporting obligations for the largest facilities and sets specific data protection and digital sovereignty requirements for high-category information systems under the National Security Framework.

    In these cases, the most sensitive data must remain within the European Economic Area and controls will be tightened on access from third countries to administration, maintenance and support tasks.

    Failure to comply with certain obligations may lead to financial compensation and sanctions, including suspension of grid access and connection rights for up to three years. Projects that are already being processed will generally have six months to adapt to the new conditions.

    35 GW between permitted capacity and projects in the queue

    The decision comes at a time of strong growth in demand for digital infrastructure in Spain. Third Vice-President and Minister for Ecological Transition, Sara Aagesen, said that data centres currently have 15 gigawatts (GW) of granted access capacity to the electricity grid, while a further 20 GW remain on the waiting list.

    The minister warned that, without control measures, the expansion of these facilities could generate an additional cost of up to 5,000 million euros per year in the electricity system, according to government estimates: 4,000 million from the impact on wholesale prices and another 1,000 million from capacity mechanisms.

    “In the absence of this Royal Decree, we would see an impact of 5,000 million euros on our bills,” said Energy Transition Minister Sara Aagesen. “We have different scenarios, but it would lead, for example, to industrial consumers having to pay 25% more for the electricity they use,” she added. These figures are government forecasts for a hypothetical scenario, not costs already incurred or savings guaranteed by the new rules.

    17,142 million euros of investment in the electricity grid

    At the same time, the government has approved new electricity grid planning up to 2030, providing for investments of 17.142 million euros to expand and reinforce infrastructure and meet rising demand. The plan includes capacity for new forms of consumption, including data centres, although it is not specifically dedicated to these facilities.

    Spain is seeking to consolidate its position as a destination for international investment in data centres, drawing on its renewable resources, connectivity and strategic location in Europe.

    The new regulation is designed to tie that growth to greater energy and environmental efficiency, in a context where the availability of electricity, water and connection capacity has become one of the key factors in the development of these projects. The impact on ongoing projects and future investment will depend on how the new obligations are applied and on the deadlines set out in the final text.

    Source: www.euronews.com

    centres data draw requires Spain
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
    Peter Novak
    • Website

    Related Posts

    How Trump and Silicon Valley got Nvidia to bring back Jensen Huang

    November 25, 2026

    Qatar says it ‘will not accept’ attacks amid diplomatic row with Iran

    November 25, 2026

    Slovakia moves to scrap postal voting for citizens living abroad

    November 25, 2026
    Leave A Reply Cancel Reply

    WARSAW WEATHER
    Economy News
    Travel

    Scandinavian Airlines: Los Angeles – Paris, France. $597 (Basic Economy) / $697 (Regular Economy). Roundtrip, including all Taxes

    By Peter NovakNovember 25, 20260

    Matrix Airfare Search by ITA Software will price this at $611 (Basic Economy). Use those dates on  Scandinavian should reprice to $597 (Basic Economy) / $697 (Regular Economy).

    Meta brings its Muse AI assistant directly into Instagram DMs

    November 25, 2026

    How Trump and Silicon Valley got Nvidia to bring back Jensen Huang

    November 25, 2026
    Top Trending
    News

    Anthropic revenue jumps 46% ahead of $2 trillion IPO bid

    By Peter NovakOctober 15, 20260

    Anthropic, the San Francisco-based developer of the Claude AI models, generated $16.8 billion (€15bn) in revenue between July and September, up about 46% from $11.5 billion (€10.3bn) in the previous three months, and posted an adjusted profit.

    News

    Reform UK hit by fresh scandal as racist views caught on camera

    By Peter NovakOctober 15, 20260

    Britain’s hard-right anti-immigration Reform UK party was hit by a fresh scandal on Thursday after party councillors and candidates were filmed in an undercover investigation using racist language.

    World

    The irony of OpenAI crying foul over spying

    By Peter NovakOctober 15, 20260

    Americans can rest easy – for the moment, at least. The fine folks at the Federal Bureau of Investigation have thwarted a major national security threat.

    Subscribe to News

    Subscribe to receive the latest breaking news, local updates, and top stories from Warsaw delivered to your inbox.

    Warsaw.Today is your trusted source for breaking news, local updates, business, politics, technology, sports, culture, and events from Warsaw, Poland—all in one place.

    Facebook X (Twitter) Instagram Pinterest YouTube

    Scandinavian Airlines: Los Angeles – Paris, France. $597 (Basic Economy) / $697 (Regular Economy). Roundtrip, including all Taxes

    November 25, 2026

    Meta brings its Muse AI assistant directly into Instagram DMs

    November 25, 2026

    How Trump and Silicon Valley got Nvidia to bring back Jensen Huang

    November 25, 2026

    Subscribe to Updates

    Subscribe to receive the latest breaking news, local updates, and top stories from Warsaw delivered to your inbox.

    © 2026 ThemeSphere. Designed by ThemeSphere.
    • About Us
    • Get In Touch
    • Disclaimer
    • Privacy Policy
    • Terms and Conditions

    Type above and press Enter to search. Press Esc to cancel.